Basement & Yard Progress!

Dallas| September 11, 2007 11:44 am

Sorry, no pictures this time!

Since the start of summer, we haven’t done a lot of work in the basement.  We did get a few things done though…  I cut the rest of the baseboards, and installed the remaining door on the laundry room.  We’ve got a few things left:

  • Paint the baseboards and install them
  • Patch the crown molding
  • Install window frames and trim
  • Install door trim on the bathroom and laundry room
  • Install a light in the laundry room
  • Finish the closet in the bathroom (Shelves and doors)
  • Flooring on the stairs
  • Trim on the stairs
  • Handrail on the stairs
  • Paint the wall in the bathroom upstairs and in the stairwell

That’s it!  Once those things are done, the project will be complete!  As you can see, the list is large, but the tasks are small.  I will probably work on these things over the winter, and have a nice big party (?) in the spring!

I’ve got a few more tasks lined up for next year.  We plan to have the tree removed from the front yard, landscaping done to level it out, and new sod or seed planted.  I also plan to move the fence by the garage back about 20 feet to move the cement pad inside the yard, and build a chain link kennel run alongside it.  I also would like to replace the fence on the north side of the yard, but I will have to talk to our neighbours about that one!

Powered by ScribeFire.