Measurable Progress, featuring our building inspector: Max!

Dallas| December 6, 2006 1:28 pm
100_4086
Building Inspector checking our drywall...

On the left, the original stack of drywall (Plus all of the insulation, more than half of which has been used already)… On the right, the stack as of December 4th, 2006. Of the original 90 sheets of drywall, we have used about 40 sheets. Based on walls/ceilings completed, we figure we are just about half done hanging drywall. At this rate, we should have just the right amount of drywall, if not a bit extra!

In this shot, you can see Max perusing our work… He has been a real work-cat… From day one he has been involved in every aspect of this project:

  • Climbing on and under the pile of debris
  • Walking in the cement and leveler when I poured it
  • Clawing up and laying in the insulation
  • Laying in the pile of sawdust by the miter saw
  • Playing with random objects (Nails, screws, wood, wire, screwdrivers, etc) on the floor
  • Laying in the trench that the plumber dug beneath the concrete, and then
  • Using the same trench as a litter box…
  • Laying on the pile of drywall while Colin tries to cut it…

I’m sure there’s more, but that’s all I could think of for now! It’s always fun having a weird cat around…

No Responses to “Measurable Progress, featuring our building inspector: Max!”

Care to comment?